N-scale model railroading.
Follow along as an n-scale sectional model railroad is built.
The construction of the New Rahel Terminus line.
(I'm not a pro, just a guy with a hobby that gives me peace of mind.)
Friday, January 6, 2017
NRTL Yard Extension & Industrial Area's Renewal
Looking south from the NRTL yard might look like a barren wasteland, but it is actually one of the first parts I ever completed on the tabletop design that I started years ago, it's the industrial area. 99% of the structures are removed and I will need to fix a couple of the tracks so they line up with the mainline and siding tracks from the yard area.
Looking north from the industrial area. The majority of the trackwork will remain untouched other than the ballasting, as it wasn't my finest effort. GEO Roberts will soon become part of a brewery complex with the structure in the center becoming the powerhouse. I will also have malting plant and add back the great Downtown Deco Warehouse, after I fix the side that I hacked off. (Haste makes waste!)
I don't want to loose this tiny block that contains the burned out hull of Wuesty's bar, the Anchor Bar, and Salenas Tavern. Due to the aligning of the tracks between the yard and the industrial areas I had to move the Italian restaurant around the corner and will reconfigure Salenas to the corner. I'm planing on adding a skinny kithbash of a DPM Bulding as well. Feeling pretty excited about it all!!
No comments:
Post a Comment